ISO 7 (Class 10,000) Cleanroom Configuration

Designed based on ISO 14644-1 Standards & Core Purification Principles

Core Standards & Definitions

  • ISO 14644-1: 0.5μm particles ≤ 352,000/m³
  • 5μm particles: ≤ 2,930/m³
  • Equivalent Standard: "Class 10,000" in GB50073-2013
  • Core Principle: Dilution & Displacement (Diluting particles via HEPA filtration)

Key Environmental Parameters

  • Air Change Rate: 30-60 times/hour (Depends on heat load/process)
  • Pressure Control: +10Pa to +15Pa relative to lower-class areas
  • Temp/Humidity: 20-24°C (±2°C), 45%-55% (±5%)
  • Illumination: Typically 300 Lux

Implementation: FFU Coverage

  • Solution: FFU (Fan Filter Unit) array forms a "ceiling filtration layer"
  • Advantages: Uniform airflow, flexible installation, high energy efficiency
  • Status: Mainstream method for ISO 7 cleanrooms
1. Air Purification & HVAC System

*Quantities estimated based on a 100㎡ cleanroom example

Device Name Specifications & Requirements Est. Qty Function & Remarks
FFU (Fan Filter Unit)
Core Device

Size: 1175x1175mm (Standard Module)
Efficiency: H14 (≥99.995% @0.3μm)
Motor: EC Brushless DC (Energy-saving)
Noise: ≤52 dB(A)
Coverage >80% Provides uniform top-down airflow; critical for ensuring sufficient air change rates.
Modular AHU (Air Handling Unit) Airflow: Based on ACR (e.g., 12,600 m³/h)
Sections: G4 Pre-filter + Cooling/Heating + Humidification + F8/F9 Mid-filter
Control: VFD (Variable Frequency Drive)
1 Unit The "Processor" of air. Handles fresh air pre-treatment, temperature, and humidity control before supplying to FFUs.
Air Shower Double/Triple-blower, Stainless Steel
Air Velocity: ≥25 m/s
Features: Interlocking doors, Auto-induction
1 Set Personnel purification channel to remove surface dust before entering the cleanroom.
Pass Box Stainless steel, UV Sterilization Lamp
Mechanical or Electronic Interlock
Min 2 Units Material transfer channel; prevents direct airflow and cross-contamination during transfer.
Return Air System Single/Double-layer grilles with primary filter Evenly Distributed Located at the bottom of walls to ensure smooth airflow and circulation.
2. Enclosure & Finishing System
Item Materials & Requirements Function & Remarks
Walls & Ceiling Color-coated steel panels (Rock wool/Mg-O core), ≥50mm thick
Smooth, corrosion-resistant, easy to clean
Forms a sealed space. Ceiling must support FFU weight and remain airtight.
Flooring PVC homogeneous sheet or Epoxy self-leveling
Anti-static, wear-resistant, seamless
Dust-free and anti-slip. Anti-static properties are crucial for electronics manufacturing.
Doors & Windows Airtight purification doors/windows, double glazing Reduces air leakage to maintain positive pressure.
Coving (Corners) Aluminum R-corners (Wall-to-Floor, Wall-to-Wall) Eliminates dead corners for easier cleaning and maintenance.
3. Monitoring & Control System
Device Name Functional Requirements
Temp & Humidity Sensors Real-time monitoring with feedback to AHU for automatic adjustment.
Differential Pressure Gauge Digitally displays pressure difference between cleanroom, outside, and adjacent areas.
Particle Counter Portable or Online type for regular verification of cleanliness levels.
Scroll to Top